The firewall has been panted and put back in place ready for the front of the cab to be made. (12-09-09)

Top


 

Tray

02/07/09
04/07/09
04/07/09
09/07/09
16/07/09
19/07/09
25/07/09
01/08/09
29/12/09

I have just got the side edges of the tray left to go.(01/08/09)

Top


Damaged mudguards

30/06/09
30/06/09
16/08/09
02/08/09
01/08/09
08/11/09
08/11/09

The mudguards have been panted but a branch fall out of a tree and damage the left one so it has to be repaired. (12/09/09)

Top


Motor

30/06/09
30/06/09
27/08/09
02/09/09
07/09/2009
26/02/2010
26/02/2010

The motor has been cleaned up, honed out and rebored, and is in the rebuild stage. The head was cracked but I have found a new one. I have cleaning up and painting the front end where the motor goes and the break lines have been replace. (26/02/10)

Top


Radiator

30/06/09
18/12/09

The radiator casing is being cleaned up and made ready for paint.

Top


 

Cab

27/07/09
01/08/09
19/09/09
Left side of cab 30/06/2009
30/08/2009

Right Side of cab 30/06/2009
12/09/09

The front of the cab (firewall) has been panted and put back in  (12/09/09)

Top


GEARBOX

05/08/09

05/08/09

16/08/09

18/08/09

The gearbox has been rebuilt and is ready to go back in, just have to get a new clutch plate that is on back order.(18/08/09)
This is a four speed gearbox with a air compressor on the side of it, this was a big thing in the 30s.

Top


29/06/09

23/10/09

18/12/09

Top

INSIDE CAB

29/12/09

29/12/09

01/01/2010

01/01/2010

01/01/2010

 

PARKER'S ELECTRICAL NQ